Application-led project matching
C&I Energy Storage Project Solutions
Requirement discovery and matched supply coordination for commercial facilities, factories, solar integration and energy-management projects.
Business applications
Designed around how a site uses energy
Product selection begins with the load profile, tariff, electrical system, installation environment and operating goal.
Peak Shaving
Support a professionally engineered strategy for selected high-demand periods.
Solar Utilization
Store eligible surplus generation and coordinate discharge with facility demand.
Backup Support
Support selected loads when switching, protection, power and energy are designed together.
Load Management
Coordinate battery operation with tariffs, facility schedules and energy priorities.
Project discovery
The right product starts with the right data
A useful initial brief includes installation country, site type, load profile, grid information, target power and energy, solar capacity, environment and required standards.
- Load profile and peak demand
- Grid voltage, frequency and phase
- Indoor or outdoor environment
- Existing or planned solar capacity
- Required standards and project schedule

Project qualification
Eight inputs required before C&I model selection
C&I systems are quoted against site data rather than an empty public specification template. Send these inputs for a matched system recommendation.
Catalog directions
Four product formats for initial evaluation
The catalog family name starts the discussion; the final datasheet must confirm power, voltage, PCS, thermal management, protection, dimensions and certification scope.
Integrated C&I Cabinet
Compact cabinet direction for project-specific power and system matching.

High-Capacity Cabinet
Outdoor cabinet direction with internal service access shown for review.

All-in-One Cabinet
Integrated enclosure direction for projects coordinating PV and storage.

Large Project ESS
Container format for projects with a defined architecture and equipment boundary.

Architecture pathways
Formats evaluated after project definition
The quotation must state which battery, controls, power conversion, thermal management and supporting equipment are included. No format shown here represents an unqualified standard offer.
Rack Integration
Flexible directions for integrators planning the wider system.
Plan rack integration →Cabinet Direction
Enclosures evaluated against capacity, environment and service-access requirements.
Integrated Direction
Consolidated formats evaluated against the confirmed project architecture and supply boundary.
Engineering views
Exterior, internal and production context
Use these views to prepare questions about access, integration, installation and the final equipment boundary.




Deployment references
See cabinet systems in real installation environments
These references add scale and site context to an initial review. They do not replace the model datasheet, project drawings or confirmed supply boundary.



EPC resources
Prepare a stronger project brief
Use these buyer guides to define the site data, integration interfaces and supply boundary before requesting a model-level quotation.
C&I Solutions for EPCs
Align battery, PCS, EMS, site data and contractual scope.
Read the guide →CHECKLIST12 Inputs Before Quotation
Organize load, grid, solar, installation and schedule data.
Open the checklist →INTEGRATIONBattery + PCS + EMS
Define the complete electrical and control interface.
Review integration →Move from a requirement to a focused product discussion
Send your project location, application goal, target power, target energy and available site data.
